StatCounter

Saturday, September 15, 2012

hull liner as headliner







 I'm using Hull liner an Ozite like fabric. I got this idea from the bus nuts forum and the stuff from:
http://www.perfectfit.com/15593/154092/Marine-Carpet-and-Hulliner/Hulliner-and-Headliner-72.html


 Supplies used. Dap landau top adhesive is the stuff to use. I got it from Rochford
http://www.rochfordsupply.com/shop/Adhesives_and_Sprays/Bulk_Adhesives/Weldwood_Contact_Adhesive/index.html
 Cement sprayed on, two coats sprayed at 90 degrees from each other. I read to do two coats on the busnuts forum. It took 3/4 of the gallon of cement.
                                                                     Glued up!
                             Needed wedges  to gain clearance to slide this panel in
                                                                 Partial install
                                                      Installed! I have three days in it.
                                                                             Texture.
Perfectfit ships without folding. No creases that way, costs a little more to ship but probably worth it. I got 6 running yards there was about a 6 inch strip left over.Not a lot of room for error.
                                                Cement works on shoes too !

Wednesday, September 5, 2012

Bending PVC conduit

 Hot bending PVC conduit. I don't have a "hot box" like a real electrician but the heat gun works if you take your time. Warming up the inside first. Took about 45 minutes total....
                                                  90 is bent, making a 3 1/4" off set.
                                                    1/2" offset on the other end
                                                 Letting it cool, it wants to go back haha
New Trojan house batteries! It seems automotive style round top posts are extinct for 2GC size batteries so we needed new bolt on cables.

Sunday, September 2, 2012

Slumping bottles and more anchors

                                                               Image with flash
                                                             No flash image
       We had about a 60% success rate due to glass sticking to kiln parts.
                  Doubled up on shelter anchors,  30 inch auger anchors set in by air impact

Sunday, July 29, 2012

Shelterlogic 14X12X32 rv shelter

When our previous storage doubled rent something needed to change. We got a shelter logic structure with an upgraded cover to store our GMC motorhome in. The payback is 14 months so it was a no brainer.  The video said 5 hours to erect but that is very optimistic!
                                                                        New home
 It all fit in one load. I had it held at the trucking terminal and picked it up. Saved some $ plus they load it with a forklift.
                                               Some of the boxes of frame tubes
 Assembled the top tubes in the shade. It was over 100F and the tubes would get so hot you couldn't hold on to them.
 Ready to lift the top section and insert wall tubes. Sue helped a lot with this.
 We cut some stainless pads to fix to the feet and pin the legs with rebar through the plates and in the ground. The plasma cutter is a everlast powerpro 256.
                                      SS plates with 5/8 rebar pins in the ground
 Anchored down. I broke two duckbill anchors as the ground is so dry and hard.
                                                                        Ends on
 We made one custom bolt as it was easier than filing the holes for line up. Every other bolt was OK for line up.
 Ready to pull the top on. It took two of us and it wasn't easy.
 Buddy Dave in action. We got the top secured before the wind picked up.
                                                 About 4" of top clearance.

Promariner battery charger, Ferro Resonant failure

Buddy Roger had a Promariner 80 amp 3 bank charger that quit on his boat. We think the electrical hi jinks that follows a code compliant rewire caused by rebuilding the docks after the Missouri river 2011 flood might have killed it. Code now requires GFI breakers at the power post which is an ongoing problem. Most boats on the docks have problems. Roger has two refrigerators and  air conditioning which give the GFI's fits.
The short version is the transformer failed so it is time to get a new charger.




Testing showed 2 volts out of the transformer open circuit and 21 volts across the capacitor. Rectifiers tested good as did the circuit breakers. Tried substituting larger and smaller caps but no joy.  Promariner has good trouble shooting information at
http://www.pmariner.com/troubleshooting_chargers.php
The transformer has failed. Better to get a new charger.

Monday, May 28, 2012

Road tripping


                                                          Running southwest
                                                                Killed a lot of bugs

                                                 Highway 50 the loneliest road
                                                                 Dust Devil




                                                  Loup City diner, we had BLT's


                 Don't take may picture and theres a car behind you, my co pilot speaks
                                                                 Fort Laramie

                                                      Drive by presidents

                                        Sue after I told her there was a guy behind her
                                                                  Geo center marker
                                         Devil's tower up close. There were some climbing it
                                                                    Devil's tower
                                                 Chimney rock has eroded
                                                View from top of Scott's Bluff