Cut the top off the old tank to use for a pattern
Clearance for shower trap
drilled holes to mark features
using a stainless bowl to form shower trap clearance
heat melts foam
blocks set depth
used a wire wheel to clean the foam off the bowl bottom after it cooled
StatCounter
Saturday, October 29, 2016
Sunday, October 16, 2016
Stripped torsion bar adjusting bolt
One side of the adjusting bolts stripped while adjusting height. Fortunately I had a longer bolt from Applied GMC in my spares. The bolt is what stripped and the nut while not the best will live on. A tap cleaned up the the threads in the nut pretty well. I did shorten the new bolt to match the original.
Friday, September 23, 2016
Tank clamps
Packing tape for release
Level setup
Three layer of 9.5 OZ glass in this layup
One side done
Clamps complete and cleaned up
Level setup
Three layer of 9.5 OZ glass in this layup
One side done
Clamps complete and cleaned up
Tuesday, August 23, 2016
Black tank level sender and drain
West epoxy with 405 adhesive filler
Cup to keep flange centered
Two layers glass outside
Test fit sender and valve
Cup to keep flange centered
Two layers glass outside
Test fit sender and valve
Monday, August 22, 2016
Fiberglass tank trim and popping the plug.
Cutoff wheel on a grinder trims pretty quick
Foam sheets that were the plug came unglued and separated. Compressed air from a blow gun helped pop the plug out of the tank.
Foam sheets that were the plug came unglued and separated. Compressed air from a blow gun helped pop the plug out of the tank.
Friday, August 19, 2016
Core bond
Marine plywood core
Taped off
Left weighted two days, peeled tape after a few hours. Bonded with West 105/206 epoxy and 405 filler.
Filled the score with West 105/206 and 405 filler
Ready for final layup
Three more layers of 8.5 oz 7725 cloth
Taped off
Left weighted two days, peeled tape after a few hours. Bonded with West 105/206 epoxy and 405 filler.
Filled the score with West 105/206 and 405 filler
Ready for final layup
Three more layers of 8.5 oz 7725 cloth
West epoxy tool clean up with white vinegar and then soap and water
Friday, August 5, 2016
Foam plug mold
Glued and weighted down
Hot wire slides better on smooth surface, wrapping template edge with aluminum cut from house siding.
Edge wrapped for a smooth slide
Hot wire cut
Template for side cut out
Slope 1-3/4" front to outlet and 1-1/4" sides to outlet
Core and support layout. Core scored halfway through.
Sides covered with packing tape, top 4 mil polyurethane film. Heating the poly took the wrinkles out after it cooled. Heating to get it to shrink and take care of wrinkles was a total guess method but it worked.
Ready to go.....
West System epoxy.......
First layer 1.5 oz cloth from
http://www.fiberglasssite.com/10-os-boating-cloth-50/
Next 3 layers 8.5 oz style 7725 cloth from
http://www.uscomposites.com/cloth.html
More layers to come after the core is bonded
Subscribe to:
Posts (Atom)